AI drafts RFI responses from your specs, drawings, and project data. Not from thin air.
Contractor asks a question. AI searches your specs, drawings, and fire strategy to draft a verified response.
Every response cites its sources. Spec clause, drawing number, and standard, so you can check before you send.
Connected to your live project data. AI understands your drawings and documents, not just generic knowledge.
This is some text inside of a div block.
RFI Response Urgent RFI-047
Contractor asks
What fire rating is required for the corridor partition at Grid C-D, Level 02?
Morgan Sindall · 10 Apr
Drafted response
The corridor partition at Grid C-D shall achieve 60 min fire resistance in accordance with the fire strategy. Refer to wall type W4A on drawing A-301 and spec clause /2.4.
Spec /2.4 Dwg A-301 Fire Strategy §3.2
Contractor submits a product. AI checks it against your spec and tells you if it passes.
Every material submittal is compared line by line against your spec requirements. Thickness, fire rating, density, certification.
Pass, fail, or revise. AI gives you a clear verdict with the exact clause that applies.
No more digging through datasheets. AI reads the product data and does the comparison for you.
This is some text inside of a div block.
Submittal Review SUB-031
Spec requires
Mineral wool slab
Clause /2.3
Thickness ≥ 100mm
Density ≥ 45 kg/m³
Fire class A1 or A2
Compliance check
Thickness 75mm < 100mm Fail
Density meets minimum Pass
Fire class A1 compliant Pass
Manufacturer approved Pass
Shop drawings reviewed before your coffee gets cold. AI catches what doesn't match your design.
AI compares dimensions, materials, and tolerances against your drawings and spec.
Goes beyond technical compliance. AI flags aesthetic issues too.
This is some text inside of a div block.
Shop Drawing Review 3 markups SD-018
A B C D 1500 1500 1500 1
Thermal break missing
Transom depth 40mm ≠ spec 50mm
Sealant joint undersized
Westfield Facades Ltd CW-01 Elevation Grid A–D Rev B · Scale 1:20 Date: 08 Apr 2026
Works with the tools your contractor already uses. Procore, Forma, Newforma, Aconex, and more.
RFIs, submittals, and daily logs sync directly from Procore, Autodesk Forma, or Aconex. No double entry.
Emails from Gmail or Outlook are monitored and routed automatically. RFIs get drafted before you open your inbox.
Connect any platform your project team uses. Avoice sits on top of your existing CA workflow, not beside it.
This is some text inside of a div block.
Integrations 5 connected
Procore
RFIs, submittals, daily logs synced
Live
Autodesk ACC
Models, sheets, issues linked
Live
Gmail
Inbox monitored, RFIs auto-drafted
Live
Newforma
Project info exchange synced
Live
Aconex
Documents, transmittals synced
Live
z
z
z
z
i
i
z
z
From workload to workflow
Try the AI workspace built for architecture.